Stokes Perna Logo
  • ABOUT US
    • PROJECTS
    • OUR TEAM
    • TESTIMONIALS
    • CAREERS
  • SERVICES
    • BUILDING PERMITS
      • OBTAIN A QUOTE
      • BUILDING PERMIT PROCESS
      • EXTENSION OF TIME
    • COUNCIL BUILDING NOTICES
    • BUILDING CONSULTING
      • Performance Solutions
      • Part 5 Residential Siting Assessment
      • Subdivisions – Reg 231
  • RESOURCES
    • FORMS
    • LINKS
    • GUIDES
  • OBTAIN A QUOTE
  • CONTACT US
  • INSPECTIONS
  • ABOUT US
    • PROJECTS
    • OUR TEAM
    • TESTIMONIALS
    • CAREERS
  • SERVICES
    • BUILDING PERMITS
      • OBTAIN A QUOTE
      • BUILDING PERMIT PROCESS
      • EXTENSION OF TIME
    • COUNCIL BUILDING NOTICES
    • BUILDING CONSULTING
      • Performance Solutions
      • Part 5 Residential Siting Assessment
      • Subdivisions – Reg 231
  • RESOURCES
    • FORMS
    • LINKS
    • GUIDES
  • OBTAIN A QUOTE
  • CONTACT US
  • INSPECTIONS

Building Notice Bass Coast Council

Received a Building Notice or Building Order from Bass Coast Council?
SP Building Surveyors can inspect unauthorised building work, prepare a compliance report, and advise on rectification or permit requirements

If you have received a Building Notice or Building Order from Bass Coast Council, it usually means council has become aware of building work that may have been carried out without the required approval, or work that may not comply with the Building Act, Building Regulations or relevant building standards.

This can include sheds, verandahs, pergolas, decks, garages, extensions, alterations, commercial fit outs, mezzanines, unauthorised structural work, or other building work completed without a building permit

SP Building Surveyors can assist owners, builders and property managers across the Bass Coast area by inspecting the existing work, reviewing available documents, and preparing a report outlining whether the work appears compliant, what rectification may be required, and whether a building permit is needed for further works.

What is the process?

You have received a Notice or Order from Council

SP Building Surveyors can provide a fee proposal to carry out an inspection of the as built structure and provide a report of its current condition.

Once an Inspection is carried out and report finalised

The building will meet one of these criteria:

  • The building complies outright in which we will issue a certification letter to Council.
  • The building will require rectification works outlined in the report. A Building Permit will be required for any further works.
  • The building is not compliant and significant changes / demolition will need to take place. At which point we may advise you it might be best to demolish your building.

What you may be required to do

  • Consult a registered draftsperson to obtain as built drawings and documenting all rectification works mentioned in our report.
  • Consult a registered engineer to provide comments and certification on any structural works. As built drawings and all rectification works may also be required.
  • Engage other consultants such as soil engineers, energy raters, bushfire assessors, etc to provide details of further works in order to achieve compliance.

PLEASE NOTE: You are not be permitted to carry out any further rectification works until such time that a building permit has been issued. We will need the above information prior to issuing a building permit.

We can work to your timeframe

SP Building Surveyors can provide an inspection within 3 days of engagement and will provide a report within 7 days. We understand that these can be delicate matters in particular keeping to council time frames.

Submission

Please submit the information below with your Building Notice or alternatively, contact our office on 9790 1033.
We will then provide you with a fee proposal within 24-48 hours.

  • Please attached a selection of photos detailing the works that are the subject of the notice.

Areas we assist with

We regularly assist with building notice and illegal building work matters throughout the Bass Coast area, including:

  • Building Notices in Adams Estate,
  • Building Notices in Almurta,
  • Building Notices in Anderson,
  • Building Notices in Archies Creek,
  • Building Notices in Bass,
  • Building Notices in Cape Paterson,
  • Building Notices in Cape Woolamai,
  • Building Notices in Churchill Island,
  • Building Notices in Corinella,
  • Building Notices in Coronet Bay,
  • Building Notices in Cowes,
  • Building Notices in Dalyston,
  • Building Notices in Glen Alvie,
  • Building Notices in Glen Forbes,
  • Building Notices in Grantville,
  • Building Notices in Harmers Haven,
  • Building Notices in Inverloch,
  • Building Notices in Jam Jerrup,
  • Building Notices in Kernot,
  • Building Notices in Kilcunda,
  • Building Notices in Kongwak,
  • Building Notices in Krowera,
  • Building Notices in Lance Creek,
  • Building Notices in Lang Lang,
  • Building Notices in Loch,
  • Building Notices in Newhaven,
  • Building Notices in North Wonthaggi,
  • Building Notices in Outtrim,
  • Building Notices in Pioneer Bay,
  • Building Notices in Pound Creek,
  • Building Notices in Queensferry,
  • Building Notices in Rhyll,
  • Building Notices in Ryanston,
  • Building Notices in San Remo,
  • Building Notices in Silverleaves,
  • Building Notices in Smiths Beach,
  • Building Notices in South Dudley,
  • Building Notices in St Clair,
  • Building Notices in Summerlands,
  • Building Notices in Sunderland Bay,
  • Building Notices in Sunset Strip,
  • Building Notices in Surf Beach,
  • Building Notices in Tenby Point,
  • Building Notices in The Gurdies,
  • Building Notices in Ventnor,
  • Building Notices in Wattle Bank,
  • Building Notices in West Creek,
  • Building Notices in Wimbledon Heights,
  • Building Notices in Wonthaggi,
  • Building Notices in Woodleigh,
  • Building Notices in Woolamai.

Contact Us

P: (03) 9790 1033 | E: info@spbuildingsurveyors.com.au

© Copyright SP Building Surveyors 2026 | BCA Performance Solutions